This renovation started in the basement with the addition of 7 new 9″x 6″ Steel Channels and beams,carrying through to the main floor with the addition of a new 21′ x 11″ Steel beam. After all of the structure was re-supported, the house was raised in the center over 2.5″ to bring the main floor back to as level as possible.